bookingkmfk.blogg.se

Altium designer 365
Altium designer 365




altium designer 365

This feature is not available with Altium Designer Standard Subscription. Tasks that apply to this project, but not to a specific document or comment, can be created on this page as General Tasks. Tasks that relate to a project document are created by assignment through the Comments system (in either Altium Designer or the Workspace).

altium designer 365

  • Tasks – view and manage assigned Task activity requests that apply to the current project.
  • Simulation – upload Simulation results files to the current project, which are then available for inspection or downloading by all users who have access to the project.
  • altium designer 365

    To do so, choose the View option from the menu commands of a Commit event tile or the commands of a Release event tile. Note that you also can view previous versions of the design from the Commit or Release events that populate the Workspace Project History view. You can review both the base design and any defined variant thereof. This view is for the latest version of the source project data, rather than a specified release from that project, and so could be considered to be a work-in-progress (WIP) view. This view uses the Web Viewer interface to present your design across five distinct data sub-views, to show the source schematic(s), board in 2D, board in 3D, Draftsman documents, and Bill of Materials respectively.

  • Design – display and navigate source project design documents, view design object properties and place review comments.
  • This management interface offers Design, Tasks, and History views options, plus more: The Workspace provides an advanced, manufacturing-oriented CAD-centric view of the project.






    Altium designer 365